Using a wide variety of State of the Art simulation tools and proven circuit design techniques, NIC’s talented engineers find innovative solutions to your problems. Listed below are examples of the industry standard design software that engineers at NIC utilize:
NIC utilizes a custom tailored MRP system to effectively manage planning, scheduling, and inventory needs of its production environment. This system provides extensive manufacturing functionality to manage and plan people, equipment, materials, and suppliers. Additionally, it provides visibility of material and labor cost variances, late orders, material shortages, over-capacity resources, and other production problems.
|
Visual – Precap |
Mil-STD-883, Method 2017 or IPC-610A |
|
Thermal Shock |
MIL-STD-202, Method 107 or MIL-STD-883, Method 1011 |
|
Hermeticity |
MIL-STD-202, Method 112D; MIL-STD-883, Method 1002 |
|
Hermeticity (Fine Leak) |
MIL-STD-202, Method 112D; MIL-STD-883, Method 1002 |
|
Final Electrical |
MIL-F-18327E or ATP |
|
Random Vibration |
MIL-STD-202, Method 214 |
|
High Frequency Sinusoidal Vibration |
MIL-STD-202, Method 204 |
|
Mechanical Shock |
MIL-STD-202, Method 213 |
|
Hermeticity (Fine Leak) |
MIL-STD-202, Method 112C |
|
Barometric Pressure |
MIL-STD-202, Method 105 |
|
Acceleration |
MIL-STD-202, Method 212A |
|
Humidity |
MIL-STD-202, Method 103 |
|
Moisture Resistance |
MIL-STD-202, Method 106 |
|
Life |
MIL-STD-202, Method 108 |
|
Salt Spray |
MIL-STD-202, Method 101 |
|
Additional Environmental Tests |
Phase Noise under Vibration, Temperature Altitude, Pressure Cycling ,Burn In Lead Integrity , Internal Water Vapor, Endpoint Electrical, PIND |